Intermittent Gas Fired Shuttle Kiln
by Therser UK on 08-Mar-2023 09:35:57
Therser UK's construction and installation of a 15 Cubic Metre Capacity Gas Fired, 3-Car Shuttle/Intermittent Kiln.
Multi Zone, Multi-Mode Combustion System
Therser’s MMC (Multi-Zone, Multi-Mode Combustion) system is capable of independently controlling each Temperature Control Zone using different combustion control philosophy. At any point in the cycle, the Furnace combustion system can be automatically switch from “High/Low” to “On Ratio” gas and air modulation to “Pulse Firing” control. The advantage with this system is that it provides optimum temperature control and heat distribution at all points of the firing cycle together with the further benefits of reducing fuel consumption in a predictable and repeatable manner.
Brief
Qty | Description |
One - | Three Car, Up Draft Shuttle / Intermittent Kiln complete with Gas Fired Combustion System, Controls and Instrumentation and all necessary ancillary equipment and services as described herewith. |
Six - | Kiln Cars including Refractory Super-structure, Chassis and Wheel Sets to suit. |
Two - | Kiln Car Standby Loading / Unloading Track Units at each end of the kiln. |
One - | Delivery and Installation of the above Equipment. |
One - | Commissioning of the above Equipment. |
For all of your needs, make an enquiry with us on our contact page https://www.therseruk.com/contact-us or call on +44 (0)1782 824453 or email sales@therseruk.com
#kilns #furnaces #hydrogen #inhouse #science #tech #h2 #heat #heattreatment #h #ceramics #metal #battery #batterymaterials #pyrolyser #chamber #pyrolysis #heat #cold #earth #planet #spares #repairs #maintenance #history
Share this
- Company News (87)
- Battery Materials (42)
- kiln (35)
- fabrication (29)
- Alloy (26)
- Furnace (26)
- Industrial Kilns (15)
- Welding (15)
- Battery (13)
- Processes (13)
- alloy fabrication (13)
- Ceramic Kilns (12)
- Shuttle Kilns (12)
- RTO’s (11)
- Vacancies (11)
- Hydrogen (9)
- Therser UK (9)
- Tunnel Kiln (9)
- Refractory (8)
- Therser (8)
- Wellman Furnaces (8)
- Brickwork (7)
- Case Studies (7)
- Afterburners (6)
- Fibre Lining (6)
- electric (6)
- Almor Wellman (5)
- thermal engineers (5)
- Biochar (4)
- Exhibition (4)
- Pyrolysis (4)
- Spares (4)
- heat treatment (4)
- History (3)
- Servicing (3)
- Ceramics Uk (2)
- Combustion Control Upgrades (2)
- Nitrogen (2)
- Temperature Control Rings (2)
- gas (2)
- Certificates (1)
- Instrumentation (1)
- MMC (1)
- RHK (1)
- Roller Hearth Kiln (1)
- Test Trials (1)
- analyser (1)
- elec (1)
- oxygen (1)
- vans (1)
- December 2024 (5)
- November 2024 (7)
- October 2024 (5)
- September 2024 (4)
- August 2024 (14)
- July 2024 (13)
- June 2024 (2)
- May 2024 (5)
- April 2024 (13)
- March 2024 (8)
- February 2024 (12)
- January 2024 (14)
- December 2023 (6)
- November 2023 (13)
- October 2023 (24)
- September 2023 (11)
- August 2023 (11)
- July 2023 (9)
- June 2023 (15)
- May 2023 (53)
- April 2023 (5)
- March 2023 (6)
- February 2023 (7)
- January 2023 (3)
- December 2022 (8)
- November 2022 (5)
- October 2022 (11)
- September 2022 (1)
- August 2022 (2)
- July 2022 (1)
- June 2022 (2)
- May 2022 (1)
- March 2022 (1)
- February 2022 (1)
- January 2022 (1)
- December 2021 (3)
- October 2021 (1)
- August 2021 (1)
- June 2021 (1)
- May 2021 (4)
- April 2021 (2)
- March 2021 (4)
- February 2021 (2)
- December 2020 (3)
- November 2020 (1)
- September 2020 (3)
- May 2020 (1)
- April 2020 (2)
- March 2020 (1)
- January 2020 (1)
- December 2019 (1)
- July 2019 (2)
- June 2019 (1)
- April 2019 (2)
- March 2019 (3)
- February 2019 (4)
- December 2018 (1)
- November 2018 (1)
- September 2018 (2)
- August 2018 (1)
- July 2018 (1)
- May 2018 (3)
- April 2018 (1)
- February 2018 (3)
- January 2018 (2)
- December 2017 (3)
- November 2017 (1)
- October 2017 (2)
- September 2017 (4)
- August 2017 (1)
- July 2017 (2)
- June 2017 (2)
- May 2017 (3)
- April 2017 (3)