Therser UK Ltd have recently completed the construction and installation of a 15 Cubic Metre Capacity Gas Fired, 3-Car Shuttle/Intermittent Kiln for Darwen Terracotta And Faience.
Qty | Description |
One - | Three Car, Up Draft Shuttle / Intermittent Kiln complete with Gas Fired Combustion System, Controls and Instrumentation and all necessary ancillary equipment and services as described herewith. |
Six - | Kiln Cars including Refractory Super-structure, Chassis and Wheel Sets to suit. |
Two - | Kiln Car Standby Loading / Unloading Track Units at each end of the kiln. |
One - | Delivery and Installation of the above Equipment. |
One - | Commissioning of the above Equipment. |
Therser’s MMC (Multi-Zone, Multi-Mode Combustion) system is capable of independently controlling each Temperature Control Zone using different combustion control philosophy. At any point in the cycle, the Furnace combustion system can be automatically switch from “High/Low” to “On Ratio” gas and air modulation to “Pulse Firing” control. The advantage with this system is that it provides optimum temperature control and heat distribution at all points of the firing cycle together with the further benefits of reducing fuel consumption in a predictable and repeatable manner.
A project manager was assigned to this project to oversee the successful build, testing and installation.
The kiln was built to the following standards: